The maximum forkheads load is 3000 daN. You have to call our technical office to know the real load according to the height and the shoring towers structure.
Coupling
every 3 meters high all shoring towers must be braced by Ø 48.3 mm tube and right angle 49/60 scaffolding couplers |
|